Construction is nearly complete for this state of the art building that will house workshop, media lab, and collaboration space offering students and faculty a centralized facility with a singular purpose of promoting the basic elements of innovation allowing the transition of new ideas into products and processes.
The design features technologically advanced materials and features including a dynamic ETFE façade as well as radiant heating and cooling. The project in on track to receive LEED Silver certification.
Please note the maximum number of participants will be 15.
Release Waiver: Each visitor will be required to complete a Visitor Release Form prior to going on the tour.
Required PPE: This is an active construction site. All visitors must bring and wear a hard hat, safety glasses, and close-toed shoes; must wear pants.
Please register on or before Thursday, June 28th.
When: Friday, June 29, 2018
Where: 3241 S. Federal Street
Jobsite Trailer adjacent to the VanderCook College of Music
Time: 11:00am - 12:30pm
Cost: Free
Register using the following link: https://www.tickettailor.com/events/cmaachicago/176396